Reduced Construction Cycle Time

Because accel-E™ STEP panels combine a multi-step installation into one process, considerable construction cycle savings can be realized. In fact, when compared to standard wall construction, the accel-E™ STEP wall system can shorten a project’s construction cycle by as much as 66%.

In addition to consolidating installation steps, the accel-E™ system also saves time in a number of other ways including:

1) Combines framing, cavity insulation and continuous rigid foam sheathing into one installation process
2) Pre-cut window and door openings to specific project requirements
3) Customized heights up to 48’ – and higher

Panels are delivered to the job site ready for installation.

Pre-cut openings reduce installation time and waste.

Panels come in heights up to 48’… and longer if needed.


 

accel-E ENERGY VIDEO

DOWNLOAD:
Construction
Efficiency Study
by RS Means


DOWNLOAD:
Metal Building Brochure