 |
 |
 |
 |
|
 |
|
 |
|
|
 |
|
| |
 |
 |
 |
 |
 |
 |
| The accel-E Wall Panel System - Installation |
 |
|
 |
| |
|
|
| |
 |
 |
 |
 |
 |
 |
|
 |
| Secure track with anchor bolts and fasteners |
 |
Install numbered panels per plan,
secure and brace as needed |
 |
Snap in and secure Spazzer® Panel Lock Bar
at all panel joints |
 |
Frame door, window and other openings with
pre-cut framing members |
 |
| Secure top track to head of wall |
| |
|
|
|
|
|
  |
 |
  |
|
|
|
 |
|
| |
|
|
|
 |
 |
| ©Copyright 2007-2008 Accelerated Building Technologies, LLC. All Rights Reserved. |
Site Map |
|
|
|